Schedule: May 2011 to October 2011
Location: WIS 29 South Frontage Road, Duck Creek to County EB (Packerland Drive)
Description: Work consists of constructing an urban roadway (County RK) with sidewalk along the south side of the roadway, street lighting, and plantings; constructing a new bridge over Duck Creek with aesthetic details; reconstructing the multi-use path under the new bridge and installing under deck lighting; reconstructing the entrance into Pamperin Park with an electronic gate, aesthetic details, and decorative luminaries; realigning Parkside Court to a future S. Memorial Drive connection; constructing a noise wall along the south side of County RK; and constructing detention ponds.
November 28 to December 2: Contractor continued to work on punch list items: Pamperin Park gate, landscaping, and general clean up.
December 5 to December 9: Contractor will finish with punch list items: Pamperin Park gate, landscaping, and general clean up.
Traffic Impacts: County RK is now open to traffic from County J to County EB (Packerland Drive). The recreational trail along Duck Creek from Shawano Avenue into Pamperin Park is open, pedestrians and bicyclists should use the trail to enter and exit the park.