For more information contact:
Kris Schuller, US 41 Project communication manager
Kris.Schuller@dot.wi.gov (920) 492-4109
US 41 Project lane closures for December 12 – December 16
Traffic restrictions in Brown and Winnebago counties
(Green Bay) The Wisconsin Department of Transportation (WisDOT) Northeast Region is announcing US 41 lane restrictions for December 12 – December 16 in Brown and Winnebago counties. Traffic impacts in Brown County include lane closures near the Glory Road overpass. Drivers in Winnebago County are reminded of reduced speed limits between WIS 21 and Breezewood Lane.
Winnebago County
WIS 26
Monday, December 12 – Friday, December 16:
• Single lane closures on northbound and southbound US 41, between County Z and WIS 26, Monday through Friday from 9 a.m. to 2 p.m. for median work.
WIS 44
Monday, December 12:
• Single lane closures on northbound US 41, between WIS 44 and Witzel Avenue, Monday from 1 to 4 p.m. to install permanent signing.
US 45
Monday, December 12:
• Southbound US 41 off-ramp to US 45 closed from 10 p.m. to 1 a.m. for overhead sign installation.
• Southbound US 45, between County T and local southbound US 41 ramps, closed from midnight to 3 a.m. for overhead sign installation. Southbound US 41 high-speed on-ramp remains open.
• Various lanes of southbound US 45, between Brooks Road and US 41, closed from midnight to 3 a.m. for overhead sign installation.
Brown County
Glory Road
Monday, December 12 – Friday, December 16:
• Various lanes of northbound and southbound US 41, between Oneida Street and Main Avenue, closed Monday through Friday from 7 p.m. to 5 a.m. for work on the Glory Road overpass.
WIS 172
Monday, October 10 – Friday, December 30:
• Southbound US 41 on-ramp from eastbound WIS 172 closed continuously through Friday, December 30 for construction of the Dutchman’s Creek box culvert.
WIS 29
Monday, December 12 – Friday, December 16:
• Various lanes of eastbound and westbound WIS 29, between Packerland Drive and County FF, closed Monday through Thursday from 6 a.m. to 2 p.m., Friday from 6 a.m. to noon for miscellaneous construction.
All lane restrictions, road openings and work operations are weather dependent and subject to change.
Visit us on Facebook and follow us on Twitter.
[Brown – all, Winnebago- all]
NOTE: News releases located on the Web at: www.US41Wisconsin.gov
For more information contact:
Kris Schuller, US 41 Project communication manager
Kris.Schuller@dot.wi.gov (920) 492-4109
Traffic restrictions in Brown and Winnebago counties
(Green Bay) The Wisconsin Department of Transportation (WisDOT) Northeast Region is announcing US 41 lane restrictions for December 12 – December 16 in Brown and Winnebago counties. Traffic impacts in Brown County include lane closures near the Glory Road overpass. Drivers in Winnebago County are reminded of reduced speed limits between WIS 21 and Breezewood Lane.
Winnebago County
WIS 26
Monday, December 12 – Friday, December 16:
• Single lane closures on northbound and southbound US 41, between County Z and WIS 26, Monday through Friday from 9 a.m. to 2 p.m. for median work.
WIS 44
Monday, December 12:
• Single lane closures on northbound US 41, between WIS 44 and Witzel Avenue, Monday from 1 to 4 p.m. to install permanent signing.
US 45
Monday, December 12:
• Southbound US 41 off-ramp to US 45 closed from 10 p.m. to 1 a.m. for overhead sign installation.
• Southbound US 45, between County T and local southbound US 41 ramps, closed from midnight to 3 a.m. for overhead sign installation. Southbound US 41 high-speed on-ramp remains open.
• Various lanes of southbound US 45, between Brooks Road and US 41, closed from midnight to 3 a.m. for overhead sign installation.
Brown County
Glory Road
Monday, December 12 – Friday, December 16:
• Various lanes of northbound and southbound US 41, between Oneida Street and Main Avenue, closed Monday through Friday from 7 p.m. to 5 a.m. for work on the Glory Road overpass.
WIS 172
Monday, October 10 – Friday, December 30:
• Southbound US 41 on-ramp from eastbound WIS 172 closed continuously through Friday, December 30 for construction of the Dutchman’s Creek box culvert.
WIS 29
Monday, December 12 – Friday, December 16:
• Various lanes of eastbound and westbound WIS 29, between Packerland Drive and County FF, closed Monday through Thursday from 6 a.m. to 2 p.m., Friday from 6 a.m. to noon for miscellaneous construction.
All lane restrictions, road openings and work operations are weather dependent and subject to change.
Visit us on Facebook and follow us on Twitter.
[Brown – all, Winnebago- all]
NOTE: News releases located on the Web at: www.US41Wisconsin.gov